Field Installation Requirements for Water-cooling Containers (single set) |
||
Infrastructure |
Floor space |
Length 7741mm * Width 6678 mm (Including container, cooling tower, and external connection piping support. The distance between container and the cooling tower is considered at 2 meters) |
Operating Area Space |
Front & Rear : reserve 2 meters at both front door and rear end; 2 meters reserved at both sides for air intakes and outlets |
|
Bearing |
12T (container) + 12T (cooling tower), cooling tower, and the container placed side by side |
|
Height |
3m (container)/ 7.5m (cooling tower) |
|
Foundation |
Floor hardening & leveling, need to be raised, and cannot be soaked in water |
|
Power |
Voltage |
Three-phase 415V/60Hz or 380V/50Hz, voltage fluctuation within ±10% (according to mining site) |
Full Load Current |
1200A*2 |
|
Open Specification |
M6S1200E3*2 |
|
Cable Specifications |
YJV-4*300+1*150 or 4*YJV-300+1*YJV-150. Surface Wiring (requires 4 pcs of five-core YJV cables, and each two can carry 500kW) |
|
Cable Length |
The length of the cable inside the container needs 3 meters. It is recommended to deploy the external cable nearby to save cable cost |
|
Grounding |
The external grounding point for the container should be reliable |
|
Water Supply/Drainage |
Cooling Tower Spray Nozzles Replenishment |
Water consumption = 1.5 T/hour Recommended water supply capacity is not less than 5T/hour ( For filling the cooling tower at the beginning) |
Cooling Tower Inlet Water Pipe Diameter |
DN40. The water supply path and on-site design should be based on the water inlet location. The construction pipeline needs to be designed with a drainage outlet, which can drain the outdoor pipeline water completely and prevent water freezing in winter.
|
|
Cooling Tower Drainage Pipe Diameter |
DN65. The site design should be based on the drainage outlet location. The construction pipeline needs to be designed with a drainage outlet, which can drain the outdoor pipeline water completely and prevent water freezing in winter.
|
Lifting |
Crane |
Recommended lift capacity of 20 tons or more, a single set of equipment equipped with a crane, boom length needs to match lifting capacity |
Lifting Height |
7.5 meters or more |
|
Forklift |
Recommend lift capacity of 5 tons or more to unload the cooling tower from the container |
|
Crew |
2-3 persons (not including crane and forklift operators) |
|
Tools |
Essential mechanical tools |
|
Other |
Lighting / Scaffolding / Scissor Lift |
|
Air Tools |
Air Pump |
It is recommended to have an air pump on-site with pressure no less than 7Kg, with 10mm outside diameter, and length of the air pipe 3-5 meters |
Protection |
Roof |
Extra protection of the container roof is recommended. |
Coolant |
Coolant |
Meet the local winter outdoor antifreeze specifications Recommended color of coolant (by order): colorless, blue, green, red Protections (gloves, goggles, etc) are recommended when refilling |
Volume |
Approximately 1.5 tons to fully filled |
|
Network |
Network Bandwidth |
100Mbps |
NDIS |
Category 5e or above shielded network cable |
|
Transportation |
Transportation Convenience |
Easy access for equipment and personnel |
Safety |
Fire Prevention |
Fire Extinguisher has to be placed on-site |
Smoke Detector |
The top of the container requires spacing for smoke detectors, which will be mounted on-site |
*Note: This is the water-cooling container parameter of AVIC version 1.3, if your product is other manufacturers or other versions, it may be slightly different from this parameter. This parameter is for reference only.
Should you have any inquiries, feel free to contact us for assistance.
![]() |