Container Water Cooling system site deployment requirements (a set) |
||
Infrastrusture |
Floor space |
Length 7741mm*width 6678mm (including container, cooling tower, external connection pipeline bracket, the distance between container and cooling tower is considered as 2m) |
Operating area space |
Front and rear: Reserve 2 meters for the front door, 2 meters for the rear end; reserve 2 meters for the air inlet and outlet on both sides |
|
Load bearing |
12T (container)+12T (cooling tower), the cooling tower and the container are arranged left and right |
|
Limitation of height |
3 meters (container) / 7.5 meters (cooling tower) |
|
Foundation |
Hardening + leveling, need to be raised, can not be soaked in water |
|
power supply |
Voltage |
Three-phase 415V/60Hz or 380V/50Hz, voltage fluctuation ±10% or less (according to the project place of use for adaptation) |
Full load current |
1200A*2 |
|
Open specification |
M6S1200E3*2 |
|
Cable Specifications |
YJV-4*300+1*150 或4*YJV-300+1*YJV-150,Open laying (requires four five-core YJV cables, each two can carry power 500kW) |
|
Cable length |
Container internal cable length needs 3 meters, external recommended to deploy nearby to save cable cost |
|
Touchdown |
The external grounding point reserved for the container body should be reliably grounded |
|
Supply / Drainage |
Cooling tower spray water |
The water consumption is 1. 5T/h, and the recommended water supply capacity is not less than 5T/h (convenient to add water to the cooling tower in the early stage) |
Cooling tower make-up water pipe diameter |
DN40, according to the water supply path, the site design and construction of the pipeline, the need to design the drainage port, can be clean outdoor pipeline water discharge, to prevent winter freezing |
|
Cooling tower drainage pipe diameter |
DN65, according to the location of the drainage outlet, the pipeline should be designed and constructed on site, and the drainage outlet should be designed, which can drain the water of the outdoor pipeline cleanly and prevent freezing in winter. |
Lifting |
Cranes |
It is recommended that a single unit of 20t or more, a single set of equipment equipped with a single crane, the boom length needs to match the lifting capacity |
Lifting height |
7.5m or more |
|
Forklift |
It is recommended that a single unit of 5t or more is responsible for hauling out the cooling tower from the container. |
|
Staff |
Without crane and forklift driver, 2~3 people |
|
Tool |
Tools required for conventional mechanical installation |
|
Others |
Lighting system / scaffolding / lift truck |
|
Pressing equipment |
Air PumpsIt is recommended that the site configuration of an air pump, the pressure is not less than 7Kg, with 10mm outside diameter, the length of the air pipe 3 ~ 5 meters |
|
Equipment protection |
Roof |
It is recommended to increase the roof protection at the site where the equipment is used |
Coolant |
Antifreeze |
Meet the local winter outdoor anti-freeze specifications, it is recommended to give priority to colorless, second choice blue, again green, red. It is recommended to do a good job of personal protection (gloves, goggles) when replenishing the liquid operation |
Quantity |
Fill up about 1.5 tons or so |
|
Network |
Network Bandwidth |
100 megabit |
Network cable specification |
Super Category 5 or above shielded network cable |
|
Transportation |
Convenience of transportation |
Need to facilitate equipment access and personnel movement |
Security |
Fire prevention |
Need to be equipped with fire extinguishers on site |
Smoke Sensor |
The top of the container is reserved for smoke sensor wiring port, which needs to be installed on site |
*Note: This is the water-cooled container parameters of CNA version 1.3, if your product is other manufacturers or other versions, may be slightly different from this parameter, this parameter is for reference only.
If you have any questions, please feel free to contact the Ant Mining Machine after-sales service
![]() |
Contact us> |
Comments
0 comments
Please sign in to leave a comment.